Bft Cty Admin Bulding
AvailableEV charging station in Beaufort, South Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 453504.
At a glance
Bft Cty Admin Bulding is a public EV charging station at 100 Ribaut Rd in Beaufort, South Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 12, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 453504 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 12, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 100 Ribaut Rd
- City
- Beaufort
- State
- South Carolina
- ZIP
- 29902
- Coordinates
- 32.43966, -80.68679
Within ~15 km
Nearby charging
Tesla Destination · Available
Non-networked · Available
- MCRD Parris Island / BEAM 32 ports
Non-networked · Available
- MCRD Parris Island / BEAM 12 ports
Non-networked · Available
- Parris Island / BEAM 22 ports
Non-networked · Available
Tesla Destination · Available
What kind of charging does Bft Cty Admin Bulding offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the South Carolina average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bft Cty Admin Bulding compare with other stations in Beaufort?
Beaufort has 12 charging stations in the DOE registry with 26 ports, the 15th-most of 130 cities and towns in South Carolina. Bft Cty Admin Bulding accounts for 8% of the charging ports in Beaufort. ChargePoint runs 2 stations in Beaufort. Statewide, South Carolina has 788 stations and 2,463 ports, the 26th-largest station count of the 51 states and DC. The biggest station in South Carolina, Manning, SC - Tesla Supercharger in Manning, has 60 ports.
Who operates Bft Cty Admin Bulding?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 268 of those stations are in South Carolina, 34% of the state's 788.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 12, 2026, one of 136 stations in South Carolina with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bft Cty Admin Bulding have?
Bft Cty Admin Bulding has 2 charging ports: 2 Level 2.
Does Bft Cty Admin Bulding have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bft Cty Admin Bulding have?
Bft Cty Admin Bulding has J1772 connectors.
Is Bft Cty Admin Bulding open to the public?
Yes. Bft Cty Admin Bulding is listed with public access, and its status is available.
Where is Bft Cty Admin Bulding?
Bft Cty Admin Bulding is at 100 Ribaut Rd, Beaufort, SC 29902. Its coordinates are 32.43966, -80.68679.
More EV charging around Beaufort
Working with South Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 453504, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bft Cty Admin Bulding, Beaufort, SC (AFDC station 453504)”, https://chargecensus.com/stations/south-carolina/bft-cty-admin-bulding-453504 (data as of October 12, 2026).