Uri Mallon Center
AvailableEV charging station in Kingston, Rhode Island on the ChargePoint network — 2 Level 2. US DOE AFDC station 201018.
At a glance
Uri Mallon Center is a public EV charging station at 5 East Alumni Ave. in Kingston, Rhode Island, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 12, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 201018 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 12, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5 East Alumni Ave.
- City
- Kingston
- State
- Rhode Island
- ZIP
- 02881
- Coordinates
- 41.48888, -71.52644
Within ~15 km
Nearby charging
Non-networked · Available
- North Kingstown Golf Course8 ports
AmpUp · Available
- Paul Masse Chevrolet South5 ports
Non-networked · Available
- Flood Ford of Narragansett4 ports
Ford Charge · Available
- 2563 S County Trl4 ports
Shell Recharge · Available
- Flood Ford of East Greenwich4 ports
Ford Charge · Available
What kind of charging does Uri Mallon Center offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Rhode Island average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Uri Mallon Center compare with other stations in Kingston?
Kingston has 2 charging stations in the DOE registry with 4 ports. Uri Mallon Center accounts for 50% of the charging ports in Kingston. ChargePoint runs 2 stations in Kingston. Statewide, Rhode Island has 386 stations and 1,046 ports, the 39th-largest station count of the 51 states and DC. The biggest station in Rhode Island, Naval Facilities Engineering Command - Naval Station Newport - Building LP20 in Newport, has 38 ports.
Who operates Uri Mallon Center?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in Rhode Island, 78% of the state's 386.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 12, 2021, one of 89 stations in Rhode Island with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Uri Mallon Center have?
Uri Mallon Center has 2 charging ports: 2 Level 2.
Does Uri Mallon Center have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Uri Mallon Center have?
Uri Mallon Center has J1772 connectors.
Is Uri Mallon Center open to the public?
Yes. Uri Mallon Center is listed with public access, and its status is available.
Where is Uri Mallon Center?
Uri Mallon Center is at 5 East Alumni Ave., Kingston, RI 02881. Its coordinates are 41.48888, -71.52644.
More EV charging around Kingston
Working with Rhode Island charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 201018, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Uri Mallon Center, Kingston, RI (AFDC station 201018)”, https://chargecensus.com/stations/rhode-island/uri-mallon-center-201018 (data as of October 12, 2026).