Ri Oer Dem Hq Fleet 5
AvailableEV charging station in North Kingstown, Rhode Island on the ChargePoint network — 2 Level 2. US DOE AFDC station 468074.
At a glance
Ri Oer Dem Hq Fleet 5 is a public EV charging station at 1100 Tower Hill Road in North Kingstown, Rhode Island, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 4, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 468074 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 4, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1100 Tower Hill Road
- City
- North Kingstown
- State
- Rhode Island
- ZIP
- 02852
- Coordinates
- 41.54664, -71.46718
Within ~15 km
Nearby charging
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- North Kingstown Golf Course8 ports
AmpUp · Available
Tesla Supercharger · Available
Non-networked · Available
What kind of charging does Ri Oer Dem Hq Fleet 5 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Rhode Island average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ri Oer Dem Hq Fleet 5 compare with other stations in North Kingstown?
North Kingstown has 18 charging stations in the DOE registry with 70 ports, the 5th-most of 39 cities and towns in Rhode Island. Ri Oer Dem Hq Fleet 5 accounts for 3% of the charging ports in North Kingstown. ChargePoint runs 15 stations in North Kingstown. Statewide, Rhode Island has 386 stations and 1,046 ports, the 39th-largest station count of the 51 states and DC. The biggest station in Rhode Island, Naval Facilities Engineering Command - Naval Station Newport - Building LP20 in Newport, has 38 ports.
Who operates Ri Oer Dem Hq Fleet 5?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in Rhode Island, 78% of the state's 386.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 4, 2026, one of 28 stations in Rhode Island with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ri Oer Dem Hq Fleet 5 have?
Ri Oer Dem Hq Fleet 5 has 2 charging ports: 2 Level 2.
Does Ri Oer Dem Hq Fleet 5 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ri Oer Dem Hq Fleet 5 have?
Ri Oer Dem Hq Fleet 5 has J1772 connectors.
Is Ri Oer Dem Hq Fleet 5 open to the public?
Yes. Ri Oer Dem Hq Fleet 5 is listed with public access, and its status is available.
Where is Ri Oer Dem Hq Fleet 5?
Ri Oer Dem Hq Fleet 5 is at 1100 Tower Hill Road, North Kingstown, RI 02852. Its coordinates are 41.54664, -71.46718.
More EV charging around North Kingstown
Working with Rhode Island charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 468074, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ri Oer Dem Hq Fleet 5, North Kingstown, RI (AFDC station 468074)”, https://chargecensus.com/stations/rhode-island/ri-oer-dem-hq-fleet-5-468074 (data as of October 12, 2026).