ChargeCensus

Ri Energy Tf Green Lot D

Available

EV charging station in Warwick, Rhode Island on the ChargePoint network — 2 Level 2. US DOE AFDC station 52824.

At a glance

Ri Energy Tf Green Lot D is a public EV charging station at T.F. Green Airport Connector Rd in Warwick, Rhode Island, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 15, 2013.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID52824
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 15, 2013
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
T.F. Green Airport Connector Rd
ZIP
02886
Coordinates
41.72392, -71.44710

Within ~15 km

Nearby charging

What kind of charging does Ri Energy Tf Green Lot D offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Rhode Island average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Ri Energy Tf Green Lot D compare with other stations in Warwick?

Warwick has 51 charging stations in the DOE registry with 135 ports, the 2nd-most of 39 cities and towns in Rhode Island. Ri Energy Tf Green Lot D accounts for 1% of the charging ports in Warwick. ChargePoint runs 38 stations in Warwick. Statewide, Rhode Island has 386 stations and 1,046 ports, the 39th-largest station count of the 51 states and DC. The biggest station in Rhode Island, Naval Facilities Engineering Command - Naval Station Newport - Building LP20 in Newport, has 38 ports.

Who operates Ri Energy Tf Green Lot D?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in Rhode Island, 78% of the state's 386.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 15, 2013, one of 10 stations in Rhode Island with a 2013 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ri Energy Tf Green Lot D have?

Ri Energy Tf Green Lot D has 2 charging ports: 2 Level 2.

Does Ri Energy Tf Green Lot D have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Ri Energy Tf Green Lot D have?

Ri Energy Tf Green Lot D has J1772 connectors.

Is Ri Energy Tf Green Lot D open to the public?

Yes. Ri Energy Tf Green Lot D is listed with public access, and its status is available.

Where is Ri Energy Tf Green Lot D?

Ri Energy Tf Green Lot D is at T.F. Green Airport Connector Rd, Warwick, RI 02886. Its coordinates are 41.72392, -71.44710.

More EV charging around Warwick

Working with Rhode Island charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 52824, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ri Energy Tf Green Lot D, Warwick, RI (AFDC station 52824)”, https://chargecensus.com/stations/rhode-island/ri-energy-tf-green-lot-d-52824 (data as of October 12, 2026).