Ri Energy Roger Williams
AvailableEV charging station in Bristol, Rhode Island on the ChargePoint network — 2 Level 2. US DOE AFDC station 87570.
At a glance
Ri Energy Roger Williams is a public EV charging station at 1 Ferry Rd in Bristol, Rhode Island, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 12, 2017.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 87570 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 12, 2017 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1 Ferry Rd
- City
- Bristol
- State
- Rhode Island
- ZIP
- 02809
- Coordinates
- 41.64754, -71.25916
Within ~15 km
Nearby charging
Non-networked · Available
Non-networked · Available
- Bristol Community College12 ports
Red E · Available
- Santander Bank10 ports
AmpUp · Available
- Charlton Hospital10 ports
AmpUp · Available
Tesla Supercharger · Available
What kind of charging does Ri Energy Roger Williams offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Rhode Island average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ri Energy Roger Williams compare with other stations in Bristol?
Bristol has 4 charging stations in the DOE registry with 8 ports, the 21st-most of 39 cities and towns in Rhode Island. Ri Energy Roger Williams accounts for 25% of the charging ports in Bristol. ChargePoint runs 3 stations in Bristol. Statewide, Rhode Island has 386 stations and 1,046 ports, the 39th-largest station count of the 51 states and DC. The biggest station in Rhode Island, Naval Facilities Engineering Command - Naval Station Newport - Building LP20 in Newport, has 38 ports.
Who operates Ri Energy Roger Williams?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in Rhode Island, 78% of the state's 386.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 12, 2017, one of 3 stations in Rhode Island with a 2017 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ri Energy Roger Williams have?
Ri Energy Roger Williams has 2 charging ports: 2 Level 2.
Does Ri Energy Roger Williams have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ri Energy Roger Williams have?
Ri Energy Roger Williams has J1772 connectors.
Is Ri Energy Roger Williams open to the public?
Yes. Ri Energy Roger Williams is listed with public access, and its status is available.
Where is Ri Energy Roger Williams?
Ri Energy Roger Williams is at 1 Ferry Rd, Bristol, RI 02809. Its coordinates are 41.64754, -71.25916.
More EV charging around Bristol
Working with Rhode Island charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 87570, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ri Energy Roger Williams, Bristol, RI (AFDC station 87570)”, https://chargecensus.com/stations/rhode-island/ri-energy-roger-williams-87570 (data as of October 12, 2026).