ChargeCensus

Hion Network Lincoln L2 2

Available

EV charging station in Lincoln, Rhode Island on the ChargePoint network — 2 Level 2. US DOE AFDC station 197892.

At a glance

Hion Network Lincoln L2 2 is a public EV charging station at 100 Twin River Road in Lincoln, Rhode Island, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 19, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID197892
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 19, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
100 Twin River Road
City
Lincoln
ZIP
02865
Coordinates
41.88956, -71.45171

Within ~15 km

Nearby charging

What kind of charging does Hion Network Lincoln L2 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Rhode Island average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Hion Network Lincoln L2 2 compare with other stations in Lincoln?

Lincoln has 7 charging stations in the DOE registry with 14 ports, the 14th-most of 39 cities and towns in Rhode Island. Hion Network Lincoln L2 2 accounts for 14% of the charging ports in Lincoln. ChargePoint runs 6 stations in Lincoln. Statewide, Rhode Island has 386 stations and 1,046 ports, the 39th-largest station count of the 51 states and DC. The biggest station in Rhode Island, Naval Facilities Engineering Command - Naval Station Newport - Building LP20 in Newport, has 38 ports.

Who operates Hion Network Lincoln L2 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in Rhode Island, 78% of the state's 386.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 19, 2021, one of 89 stations in Rhode Island with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Hion Network Lincoln L2 2 have?

Hion Network Lincoln L2 2 has 2 charging ports: 2 Level 2.

Does Hion Network Lincoln L2 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Hion Network Lincoln L2 2 have?

Hion Network Lincoln L2 2 has J1772 connectors.

Is Hion Network Lincoln L2 2 open to the public?

Yes. Hion Network Lincoln L2 2 is listed with public access, and its status is available.

Where is Hion Network Lincoln L2 2?

Hion Network Lincoln L2 2 is at 100 Twin River Road, Lincoln, RI 02865. Its coordinates are 41.88956, -71.45171.

More EV charging around Lincoln

Working with Rhode Island charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 197892, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Hion Network Lincoln L2 2, Lincoln, RI (AFDC station 197892)”, https://chargecensus.com/stations/rhode-island/hion-network-lincoln-l2-2-197892 (data as of October 12, 2026).