ChargeCensus

2027 Post Rd

Available

EV charging station in Warwick, Rhode Island on the Shell Recharge network — 6 DC fast. US DOE AFDC station 422229.

At a glance

2027 Post Rd is a public EV charging station at 2027 Post Rd in Warwick, Rhode Island, on the Shell Recharge network. It has 6 charging ports (6 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Sep 13, 2025.

Total ports
6
DC fast
6
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID422229
NetworkShell Recharge
StatusAvailable (E)
AccessPublic
Open dateSep 13, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Shell Recharge

Operates 87 stations in the DOE registry — view the full network →

Location

Address
2027 Post Rd
ZIP
02886
Coordinates
41.72626, -71.43990

Within ~15 km

Nearby charging

What kind of charging does 2027 Post Rd offer?

Of its 6 ports, 6 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 2.2 times the Rhode Island average of 2.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does 2027 Post Rd compare with other stations in Warwick?

Warwick has 51 charging stations in the DOE registry with 135 ports, the 2nd-most of 39 cities and towns in Rhode Island. 2027 Post Rd accounts for 4% of the charging ports in Warwick. Shell Recharge runs 2 stations in Warwick. Statewide, Rhode Island has 386 stations and 1,046 ports, the 39th-largest station count of the 51 states and DC. The biggest station in Rhode Island, Naval Facilities Engineering Command - Naval Station Newport - Building LP20 in Newport, has 38 ports.

Who operates 2027 Post Rd?

Formerly Greenlots — Shell's charging network. Shell Recharge operates 87 stations in the registry across 15 states, with 563 DC fast and 71 Level 2 ports in total. 7 of those stations are in Rhode Island, 2% of the state's 386.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 13, 2025, one of 34 stations in Rhode Island with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 2027 Post Rd have?

2027 Post Rd has 6 charging ports: 6 DC fast.

Does 2027 Post Rd have DC fast charging?

Yes. The registry lists 6 DC fast ports at 2027 Post Rd, with CCS connectors.

What connectors does 2027 Post Rd have?

2027 Post Rd has CCS connectors.

Is 2027 Post Rd open to the public?

Yes. 2027 Post Rd is listed with public access, and its status is available.

Where is 2027 Post Rd?

2027 Post Rd is at 2027 Post Rd, Warwick, RI 02886. Its coordinates are 41.72626, -71.43990.

More EV charging around Warwick

Working with Rhode Island charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 422229, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “2027 Post Rd, Warwick, RI (AFDC station 422229)”, https://chargecensus.com/stations/rhode-island/2027-post-rd-422229 (data as of October 12, 2026).