W&L Nissan W&L Nissan 1
AvailableEV charging station in Shamokin Dam, Pennsylvania on the ChargePoint network — 2 Level 2. US DOE AFDC station 318042.
At a glance
W&L Nissan W&L Nissan 1 is a public EV charging station at 3819 North Susquehanna Trail in Shamokin Dam, Pennsylvania, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 10, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 318042 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 10, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 3819 North Susquehanna Trail
- City
- Shamokin Dam
- State
- Pennsylvania
- ZIP
- 17876
- Coordinates
- 40.85669, -76.81305
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- i-Fuel - Tesla Destination6 ports
Tesla Destination · Available
- SWTCH Energy Inc.4 ports
SWTCH · Available
- Geisinger Lewisburg Ca 12 ports
ChargePoint · Available
- Bucknell Station 032 ports
ChargePoint · Available
- Bucknell Soccorfield Ev22 ports
ChargePoint · Available
What kind of charging does W&L Nissan W&L Nissan 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% below the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does W&L Nissan W&L Nissan 1 compare with other stations in Shamokin Dam?
Shamokin Dam has 1 charging station in the DOE registry with 2 ports. It is the only ChargePoint station in Shamokin Dam. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.
Who operates W&L Nissan W&L Nissan 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,223 of those stations are in Pennsylvania, 55% of the state's 2,244.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 10, 2023, one of 391 stations in Pennsylvania with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does W&L Nissan W&L Nissan 1 have?
W&L Nissan W&L Nissan 1 has 2 charging ports: 2 Level 2.
Does W&L Nissan W&L Nissan 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does W&L Nissan W&L Nissan 1 have?
W&L Nissan W&L Nissan 1 has J1772 connectors.
Is W&L Nissan W&L Nissan 1 open to the public?
Yes. W&L Nissan W&L Nissan 1 is listed with public access, and its status is available.
Where is W&L Nissan W&L Nissan 1?
W&L Nissan W&L Nissan 1 is at 3819 North Susquehanna Trail, Shamokin Dam, PA 17876. Its coordinates are 40.85669, -76.81305.
More EV charging around Shamokin Dam
Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 318042, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “W&L Nissan W&L Nissan 1, Shamokin Dam, PA (AFDC station 318042)”, https://chargecensus.com/stations/pennsylvania/w-l-nissan-w-l-nissan-1-318042 (data as of October 12, 2026).