ChargeCensus

Pt Chargepoint Palmiero Cp

Available

EV charging station in Meadville, Pennsylvania on the ChargePoint network — 2 Level 2. US DOE AFDC station 259249.

At a glance

Pt Chargepoint Palmiero Cp is a public EV charging station at 16165 Conneaut Lake Rd in Meadville, Pennsylvania, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 13, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 2 nearby

Station record

DOE registry record

FieldValue
AFDC station ID259249
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 13, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
16165 Conneaut Lake Rd
City
Meadville
ZIP
16335
Coordinates
41.62025, -80.21170

Within ~15 km

Nearby charging

What kind of charging does Pt Chargepoint Palmiero Cp offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% below the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Pt Chargepoint Palmiero Cp compare with other stations in Meadville?

Meadville has 3 charging stations in the DOE registry with 16 ports. Pt Chargepoint Palmiero Cp accounts for 13% of the charging ports in Meadville. It is the only ChargePoint station in Meadville. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.

Who operates Pt Chargepoint Palmiero Cp?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,223 of those stations are in Pennsylvania, 55% of the state's 2,244.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 13, 2023, one of 391 stations in Pennsylvania with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Pt Chargepoint Palmiero Cp have?

Pt Chargepoint Palmiero Cp has 2 charging ports: 2 Level 2.

Does Pt Chargepoint Palmiero Cp have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Pt Chargepoint Palmiero Cp have?

Pt Chargepoint Palmiero Cp has J1772 connectors.

Is Pt Chargepoint Palmiero Cp open to the public?

Yes. Pt Chargepoint Palmiero Cp is listed with public access, and its status is available.

Where is Pt Chargepoint Palmiero Cp?

Pt Chargepoint Palmiero Cp is at 16165 Conneaut Lake Rd, Meadville, PA 16335. Its coordinates are 41.62025, -80.21170.

More EV charging around Meadville

Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 259249, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Pt Chargepoint Palmiero Cp, Meadville, PA (AFDC station 259249)”, https://chargecensus.com/stations/pennsylvania/pt-chargepoint-palmiero-cp-259249 (data as of October 12, 2026).