Pit1
AvailableEV charging station in Beaver Falls, Pennsylvania on the AmpUp network — 1 Level 2. US DOE AFDC station 335453.
At a glance
Pit1 is a private EV charging station at 400 Enterprise Dr Suite 103 in Beaver Falls, Pennsylvania, on the AmpUp network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 31, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 335453 |
| Network | AmpUp |
| Status | Available (E) |
| Access | Private |
| Facility | Other |
| Open date | Jan 31, 2024 |
| Last updated at source | Oct 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 400 Enterprise Dr Suite 103
- City
- Beaver Falls
- State
- Pennsylvania
- ZIP
- 15010
- Coordinates
- 40.82188, -80.31910
Within ~15 km
Nearby charging
- Beaver County Courthouse2 ports
ChargePoint · Available
- Beaver County Nissan1 ports
Non-networked · Available
ChargePoint · Available
ChargePoint · Available
What kind of charging does Pit1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 65% below the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.
How does Pit1 compare with other stations in Beaver Falls?
Beaver Falls has 4 charging stations in the DOE registry with 4 ports. Pit1 accounts for 25% of the charging ports in Beaver Falls. It is the only AmpUp station in Beaver Falls. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.
Who operates Pit1?
AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 17 of those stations are in Pennsylvania, under 1% of the state's 2,244.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Jan 31, 2024, one of 345 stations in Pennsylvania with a 2024 open date. The station's record was last updated at the source on Oct 2, 2026.
Frequently asked questions
How many chargers does Pit1 have?
Pit1 has 1 charging port: 1 Level 2.
Does Pit1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Pit1 have?
Pit1 has J1772 connectors.
Is Pit1 open to the public?
No. Pit1 is listed with private access.
Where is Pit1?
Pit1 is at 400 Enterprise Dr Suite 103, Beaver Falls, PA 15010. Its coordinates are 40.82188, -80.31910.
More EV charging around Beaver Falls
Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 335453, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pit1, Beaver Falls, PA (AFDC station 335453)”, https://chargecensus.com/stations/pennsylvania/pit1-335453 (data as of October 12, 2026).