Penn State Hbg Library Lot 3
AvailableEV charging station in Middletown, Pennsylvania on the ChargePoint network — 2 Level 2. US DOE AFDC station 470381.
At a glance
Penn State Hbg Library Lot 3 is a public EV charging station at 351 Olmsted Dr in Middletown, Pennsylvania, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 23, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 470381 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 23, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 351 Olmsted Dr
- City
- Middletown
- State
- Pennsylvania
- ZIP
- 17057
- Coordinates
- 40.20379, -76.74039
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Cramer Auto Mall12 ports
ViaLynk · Available
- Dunkn' Middletown12 ports
Nayax Energy · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Electrify America · Available
What kind of charging does Penn State Hbg Library Lot 3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% below the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Penn State Hbg Library Lot 3 compare with other stations in Middletown?
Middletown has 9 charging stations in the DOE registry with 46 ports. Penn State Hbg Library Lot 3 accounts for 4% of the charging ports in Middletown. ChargePoint runs 2 stations in Middletown. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.
Who operates Penn State Hbg Library Lot 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,223 of those stations are in Pennsylvania, 55% of the state's 2,244.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 23, 2026, one of 239 stations in Pennsylvania with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Penn State Hbg Library Lot 3 have?
Penn State Hbg Library Lot 3 has 2 charging ports: 2 Level 2.
Does Penn State Hbg Library Lot 3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Penn State Hbg Library Lot 3 have?
Penn State Hbg Library Lot 3 has J1772 connectors.
Is Penn State Hbg Library Lot 3 open to the public?
Yes. Penn State Hbg Library Lot 3 is listed with public access, and its status is available.
Where is Penn State Hbg Library Lot 3?
Penn State Hbg Library Lot 3 is at 351 Olmsted Dr, Middletown, PA 17057. Its coordinates are 40.20379, -76.74039.
More EV charging around Middletown
Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 470381, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Penn State Hbg Library Lot 3, Middletown, PA (AFDC station 470381)”, https://chargecensus.com/stations/pennsylvania/penn-state-hbg-library-lot-3-470381 (data as of October 12, 2026).