ChargeCensus

Mzchargept Toyota Ct4k 1

Available

EV charging station in East Petersburg, Pennsylvania on the ChargePoint network — 2 Level 2. US DOE AFDC station 228871.

At a glance

Mzchargept Toyota Ct4k 1 is a public EV charging station at 5270 Manheim Pike Front Near Toyota Sign in East Petersburg, Pennsylvania, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 22, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID228871
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 22, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5270 Manheim Pike Front Near Toyota Sign
City
East Petersburg
ZIP
17520
Coordinates
40.08962, -76.34706

Within ~15 km

Nearby charging

What kind of charging does Mzchargept Toyota Ct4k 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% below the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Mzchargept Toyota Ct4k 1 compare with other stations in East Petersburg?

East Petersburg has 7 charging stations in the DOE registry with 16 ports. Mzchargept Toyota Ct4k 1 accounts for 13% of the charging ports in East Petersburg. ChargePoint runs 5 stations in East Petersburg. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.

Who operates Mzchargept Toyota Ct4k 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,223 of those stations are in Pennsylvania, 55% of the state's 2,244.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 22, 2022, one of 255 stations in Pennsylvania with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Mzchargept Toyota Ct4k 1 have?

Mzchargept Toyota Ct4k 1 has 2 charging ports: 2 Level 2.

Does Mzchargept Toyota Ct4k 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Mzchargept Toyota Ct4k 1 have?

Mzchargept Toyota Ct4k 1 has J1772 connectors.

Is Mzchargept Toyota Ct4k 1 open to the public?

Yes. Mzchargept Toyota Ct4k 1 is listed with public access, and its status is available.

Where is Mzchargept Toyota Ct4k 1?

Mzchargept Toyota Ct4k 1 is at 5270 Manheim Pike Front Near Toyota Sign, East Petersburg, PA 17520. Its coordinates are 40.08962, -76.34706.

More EV charging around East Petersburg

Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 228871, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Mzchargept Toyota Ct4k 1, East Petersburg, PA (AFDC station 228871)”, https://chargecensus.com/stations/pennsylvania/mzchargept-toyota-ct4k-1-228871 (data as of October 12, 2026).