ChargeCensus

Easton Ford

Available

EV charging station in Easton, Pennsylvania on the Red E network — 4 DC fast · 4 Level 2. US DOE AFDC station 400492.

At a glance

Easton Ford is a public EV charging station at 3810 Hecktown Rd Suite D in Easton, Pennsylvania, on the Red E network. It has 8 charging ports (4 DC fast · 4 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Mar 25, 2025.

Total ports
8
DC fast
4
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID400492
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateMar 25, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
3810 Hecktown Rd Suite D
City
Easton
ZIP
18045
Coordinates
40.70008, -75.28724

Within ~15 km

Nearby charging

What kind of charging does Easton Ford offer?

Of its 8 ports, 4 are DC fast and 4 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.8 times the Pennsylvania average of 2.9 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.

How does Easton Ford compare with other stations in Easton?

Easton has 27 charging stations in the DOE registry with 76 ports, the 11th-most of 415 cities and towns in Pennsylvania. Easton Ford accounts for 11% of the charging ports in Easton. It is the only Red E station in Easton. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.

Who operates Easton Ford?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 17 of those stations are in Pennsylvania, under 1% of the state's 2,244.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 25, 2025, one of 275 stations in Pennsylvania with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Easton Ford have?

Easton Ford has 8 charging ports: 4 DC fast · 4 Level 2.

Does Easton Ford have DC fast charging?

Yes. The registry lists 4 DC fast ports at Easton Ford, with CCS connectors.

What connectors does Easton Ford have?

Easton Ford has J1772 and CCS connectors.

Is Easton Ford open to the public?

Yes. Easton Ford is listed with public access, and its status is available.

Where is Easton Ford?

Easton Ford is at 3810 Hecktown Rd Suite D, Easton, PA 18045. Its coordinates are 40.70008, -75.28724.

More EV charging around Easton

Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 400492, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Easton Ford, Easton, PA (AFDC station 400492)”, https://chargecensus.com/stations/pennsylvania/easton-ford-400492 (data as of October 12, 2026).