Bdn - 201 Kop
AvailableEV charging station in Wayne, Pennsylvania on the ChargePoint network — 2 Level 2. US DOE AFDC station 147077.
At a glance
Bdn - 201 Kop is a public EV charging station at 201 King of Prussia Rd in Wayne, Pennsylvania, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 19, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 147077 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 19, 2019 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 201 King of Prussia Rd
- City
- Wayne
- State
- Pennsylvania
- ZIP
- 19087
- Coordinates
- 40.04393, -75.35770
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Springfield Ford12 ports
Red E · Available
- King of Prussia, PA8 ports
Rivian Adventure Network · Available
- Greene Countrie Village8 ports
Red E · Available
- 50 At Granite Run8 ports
Blink · Available
What kind of charging does Bdn - 201 Kop offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% below the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bdn - 201 Kop compare with other stations in Wayne?
Wayne has 9 charging stations in the DOE registry with 20 ports. Bdn - 201 Kop accounts for 10% of the charging ports in Wayne. ChargePoint runs 7 stations in Wayne. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.
Who operates Bdn - 201 Kop?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,223 of those stations are in Pennsylvania, 55% of the state's 2,244.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 19, 2019, one of 111 stations in Pennsylvania with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bdn - 201 Kop have?
Bdn - 201 Kop has 2 charging ports: 2 Level 2.
Does Bdn - 201 Kop have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bdn - 201 Kop have?
Bdn - 201 Kop has J1772 connectors.
Is Bdn - 201 Kop open to the public?
Yes. Bdn - 201 Kop is listed with public access, and its status is available.
Where is Bdn - 201 Kop?
Bdn - 201 Kop is at 201 King of Prussia Rd, Wayne, PA 19087. Its coordinates are 40.04393, -75.35770.
More EV charging around Wayne
Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 147077, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bdn - 201 Kop, Wayne, PA (AFDC station 147077)”, https://chargecensus.com/stations/pennsylvania/bdn-201-kop-147077 (data as of October 12, 2026).