ChargeCensus

Adams Electric Aec Gburg Dist

Available

EV charging station in Gettysburg, Pennsylvania on the ChargePoint network — 2 Level 2. US DOE AFDC station 213679.

At a glance

Adams Electric Aec Gburg Dist is a public EV charging station at 1380 Biglerville Rd in Gettysburg, Pennsylvania, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 9, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID213679
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 9, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1380 Biglerville Rd
City
Gettysburg
ZIP
17325
Coordinates
39.86283, -77.23860

Within ~15 km

Nearby charging

What kind of charging does Adams Electric Aec Gburg Dist offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% below the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Adams Electric Aec Gburg Dist compare with other stations in Gettysburg?

Gettysburg has 9 charging stations in the DOE registry with 23 ports. Adams Electric Aec Gburg Dist accounts for 9% of the charging ports in Gettysburg. ChargePoint runs 3 stations in Gettysburg. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.

Who operates Adams Electric Aec Gburg Dist?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,223 of those stations are in Pennsylvania, 55% of the state's 2,244.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 9, 2022, one of 255 stations in Pennsylvania with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Adams Electric Aec Gburg Dist have?

Adams Electric Aec Gburg Dist has 2 charging ports: 2 Level 2.

Does Adams Electric Aec Gburg Dist have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Adams Electric Aec Gburg Dist have?

Adams Electric Aec Gburg Dist has J1772 connectors.

Is Adams Electric Aec Gburg Dist open to the public?

Yes. Adams Electric Aec Gburg Dist is listed with public access, and its status is available.

Where is Adams Electric Aec Gburg Dist?

Adams Electric Aec Gburg Dist is at 1380 Biglerville Rd, Gettysburg, PA 17325. Its coordinates are 39.86283, -77.23860.

More EV charging around Gettysburg

Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 213679, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Adams Electric Aec Gburg Dist, Gettysburg, PA (AFDC station 213679)”, https://chargecensus.com/stations/pennsylvania/adams-electric-aec-gburg-dist-213679 (data as of October 12, 2026).