Abe Rfid-Dual-18 #4
AvailableEV charging station in Allentown, Pennsylvania on the ChargePoint network — 2 Level 2. US DOE AFDC station 186137.
At a glance
Abe Rfid-Dual-18 #4 is a public EV charging station at 3311 Airport Rd in Allentown, Pennsylvania, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 12, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 186137 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 12, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 3311 Airport Rd
- City
- Allentown
- State
- Pennsylvania
- ZIP
- 18109
- Coordinates
- 40.65112, -75.43367
Within ~15 km
Nearby charging
- Lutron HQ17 ports
Non-networked · Available
Tesla Supercharger · Available
- Nazareth Ford10 ports
Red E · Available
- Bethlehem Ford9 ports
Red E · Available
- Polk Street Garage8 ports
Flash · Available
Tesla Supercharger · Available
What kind of charging does Abe Rfid-Dual-18 #4 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% below the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Abe Rfid-Dual-18 #4 compare with other stations in Allentown?
Allentown has 54 charging stations in the DOE registry with 152 ports, the 4th-most of 415 cities and towns in Pennsylvania. Abe Rfid-Dual-18 #4 accounts for 1% of the charging ports in Allentown. ChargePoint runs 33 stations in Allentown. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.
Who operates Abe Rfid-Dual-18 #4?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,223 of those stations are in Pennsylvania, 55% of the state's 2,244.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 12, 2021, one of 287 stations in Pennsylvania with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Abe Rfid-Dual-18 #4 have?
Abe Rfid-Dual-18 #4 has 2 charging ports: 2 Level 2.
Does Abe Rfid-Dual-18 #4 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Abe Rfid-Dual-18 #4 have?
Abe Rfid-Dual-18 #4 has J1772 connectors.
Is Abe Rfid-Dual-18 #4 open to the public?
Yes. Abe Rfid-Dual-18 #4 is listed with public access, and its status is available.
Where is Abe Rfid-Dual-18 #4?
Abe Rfid-Dual-18 #4 is at 3311 Airport Rd, Allentown, PA 18109. Its coordinates are 40.65112, -75.43367.
More EV charging around Allentown
Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 186137, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Abe Rfid-Dual-18 #4, Allentown, PA (AFDC station 186137)”, https://chargecensus.com/stations/pennsylvania/abe-rfid-dual-18-4-186137 (data as of October 12, 2026).