ChargeCensus

Wshco. P5-1 Public

Available

EV charging station in Hillsboro, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 386982.

At a glance

Wshco. P5-1 Public is a public EV charging station at 160 NW Lincoln St in Hillsboro, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 27, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID386982
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 27, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
160 NW Lincoln St
State
Oregon
ZIP
97124
Coordinates
45.52407, -122.99085

Within ~15 km

Nearby charging

What kind of charging does Wshco. P5-1 Public offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Wshco. P5-1 Public compare with other stations in Hillsboro?

Hillsboro has 97 charging stations in the DOE registry with 203 ports, the 3rd-most of 194 cities and towns in Oregon. Wshco. P5-1 Public accounts for under 1% of the charging ports in Hillsboro. ChargePoint runs 81 stations in Hillsboro. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Wshco. P5-1 Public?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 27, 2025, one of 358 stations in Oregon with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Wshco. P5-1 Public have?

Wshco. P5-1 Public has 2 charging ports: 2 Level 2.

Does Wshco. P5-1 Public have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Wshco. P5-1 Public have?

Wshco. P5-1 Public has J1772 connectors.

Is Wshco. P5-1 Public open to the public?

Yes. Wshco. P5-1 Public is listed with public access, and its status is available.

Where is Wshco. P5-1 Public?

Wshco. P5-1 Public is at 160 NW Lincoln St, Hillsboro, OR 97124. Its coordinates are 45.52407, -122.99085.

More EV charging around Hillsboro

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 386982, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wshco. P5-1 Public, Hillsboro, OR (AFDC station 386982)”, https://chargecensus.com/stations/oregon/wshco-p5-1-public-386982 (data as of October 12, 2026).