ChargeCensus

Timberline

Available

EV charging station in Government Camp, Oregon on the FLO network — 6 Level 2. US DOE AFDC station 316853.

At a glance

Timberline is a public EV charging station at 27500 E. Timberline Rd in Government Camp, Oregon, on the FLO network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 7, 2023.

Total ports
6
DC fast
0
Level 2
6
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID316853
NetworkFLO
StatusAvailable (E)
AccessPublic
Open dateNov 7, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

FLO

Operates 1,246 stations in the DOE registry — view the full network →

Location

Address
27500 E. Timberline Rd
City
Government Camp
State
Oregon
ZIP
97028
Coordinates
45.33046, -121.70897

Within ~15 km

Nearby charging

What kind of charging does Timberline offer?

Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.3 times the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Timberline compare with other stations in Government Camp?

Government Camp has 2 charging stations in the DOE registry with 8 ports. Timberline accounts for 75% of the charging ports in Government Camp. It is the only FLO station in Government Camp. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Timberline?

FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 32 of those stations are in Oregon, 2% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 7, 2023, one of 225 stations in Oregon with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Timberline have?

Timberline has 6 charging ports: 6 Level 2.

Does Timberline have DC fast charging?

No. The registry lists no DC fast ports here; its 6 ports are all Level 2.

What connectors does Timberline have?

Timberline has J1772 connectors.

Is Timberline open to the public?

Yes. Timberline is listed with public access, and its status is available.

Where is Timberline?

Timberline is at 27500 E. Timberline Rd, Government Camp, OR 97028. Its coordinates are 45.33046, -121.70897.

More EV charging around Government Camp

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 316853, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Timberline, Government Camp, OR (AFDC station 316853)”, https://chargecensus.com/stations/oregon/timberline-316853 (data as of October 12, 2026).