The Grateful Vineyard
AvailableEV charging station in Mt. Hood, Oregon, not on a charging network — 1 Level 2. US DOE AFDC station 165350.
At a glance
The Grateful Vineyard is a public EV charging station at 6670 Trout Creek Ridge Rd in Mt. Hood, Oregon, not attached to a charging network. It has 1 charging port (1 Level 2) with NACS (Tesla) connectors. The US DOE registry lists it as available, open since Aug 10, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 165350 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Brewery / distillery / winery |
| Open date | Aug 10, 2020 |
| Last updated at source | Sep 14, 2026 |
Plugs
Connectors & pricing
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: Free
Location
- Address
- 6670 Trout Creek Ridge Rd
- City
- Mt. Hood
- State
- Oregon
- ZIP
- 97041
- Coordinates
- 45.53652, -121.62152
Within ~15 km
Nearby charging
- Gorge White House2 ports
ZEF Energy · Available
- Parkdale Community Center2 ports
ZEF Energy · Available
Tesla Destination · Available
- Mt. Hood Town Hall2 ports
ZEF Energy · Available
Tesla Destination · Available
- Cooper Spur Inn2 ports
ZEF Energy · Available
What kind of charging does The Grateful Vineyard offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Oregon average of 2.6 ports per station. The registry lists one connector type: NACS (Tesla), the North American Charging Standard connector. Pricing as reported to the registry: “Free”. The site is listed as a brewery / distillery / winery location.
How does The Grateful Vineyard compare with other stations in Mt. Hood?
Mt. Hood has 3 charging stations in the DOE registry with 9 ports. The Grateful Vineyard accounts for 11% of the charging ports in Mt. Hood. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates The Grateful Vineyard?
The Grateful Vineyard is listed as non-networked: its chargers are not run through a charging-network account. Oregon has 181 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 10, 2020, one of 81 stations in Oregon with a 2020 open date. The station's record was last updated at the source on Sep 14, 2026.
Frequently asked questions
How many chargers does The Grateful Vineyard have?
The Grateful Vineyard has 1 charging port: 1 Level 2.
Does The Grateful Vineyard have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does The Grateful Vineyard have?
The Grateful Vineyard has NACS (Tesla) connectors.
Is charging at The Grateful Vineyard free?
Pricing as reported to the DOE registry: Free.
Is The Grateful Vineyard open to the public?
Yes. The Grateful Vineyard is listed with public access, and its status is available.
Where is The Grateful Vineyard?
The Grateful Vineyard is at 6670 Trout Creek Ridge Rd, Mt. Hood, OR 97041. Its coordinates are 45.53652, -121.62152.
More EV charging around Mt. Hood
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 165350, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Grateful Vineyard, Mt. Hood, OR (AFDC station 165350)”, https://chargecensus.com/stations/oregon/the-grateful-vineyard-165350 (data as of October 12, 2026).