Stack Infra Por Por03a Evc-3
AvailableEV charging station in Hillsboro, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 469775.
At a glance
Stack Infra Por Por03a Evc-3 is a public EV charging station at 4735 Northeast Starr Boulevard in Hillsboro, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 18, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 469775 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 18, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- Transportation - 5th St North32 ports
OpConnect · Available
- Nike - LeBron19 ports
Non-networked · Available
- Fred Meyer - Tesla Supercharger16 ports
Tesla Supercharger · Available
- Nike - Hocken12 ports
Non-networked · Available
- 12505 SW North Dakota12 ports
Autel · Available
- Nike - Terman12 ports
Non-networked · Available
What kind of charging does Stack Infra Por Por03a Evc-3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Stack Infra Por Por03a Evc-3 compare with other stations in Hillsboro?
Hillsboro has 97 charging stations in the DOE registry with 203 ports, the 3rd-most of 194 cities and towns in Oregon. Stack Infra Por Por03a Evc-3 accounts for under 1% of the charging ports in Hillsboro. ChargePoint runs 81 stations in Hillsboro. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Stack Infra Por Por03a Evc-3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 18, 2026, one of 187 stations in Oregon with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Stack Infra Por Por03a Evc-3 have?
Stack Infra Por Por03a Evc-3 has 2 charging ports: 2 Level 2.
Does Stack Infra Por Por03a Evc-3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Stack Infra Por Por03a Evc-3 have?
Stack Infra Por Por03a Evc-3 has J1772 connectors.
Is Stack Infra Por Por03a Evc-3 open to the public?
Yes. Stack Infra Por Por03a Evc-3 is listed with public access, and its status is available.
Where is Stack Infra Por Por03a Evc-3?
Stack Infra Por Por03a Evc-3 is at 4735 Northeast Starr Boulevard, Hillsboro, OR 97124. Its coordinates are 45.55417, -122.94178.
More EV charging around Hillsboro
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 469775, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Stack Infra Por Por03a Evc-3, Hillsboro, OR (AFDC station 469775)”, https://chargecensus.com/stations/oregon/stack-infra-por-por03a-evc-3-469775 (data as of October 12, 2026).