Stack Infra Por Evc-6
AvailableEV charging station in Albany, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 469801.
At a glance
Stack Infra Por Evc-6 is a public EV charging station at 3130 NE Transition Parkway in Albany, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 18, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 469801 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 18, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- Walmart 5396 (Albany, OR)4 ports
Electrify America · Available
- Lbcc Lbcc Dual 22 ports
ChargePoint · Available
- Lbcc Lbcc Dual 32 ports
ChargePoint · Available
- Lbcc Lbcc Dual 12 ports
ChargePoint · Available
- Albany Ymca Station 22 ports
ChargePoint · Available
- Chevron - Albany2 ports
EVCS · Available
What kind of charging does Stack Infra Por Evc-6 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Stack Infra Por Evc-6 compare with other stations in Albany?
Albany has 13 charging stations in the DOE registry with 24 ports. Stack Infra Por Evc-6 accounts for 8% of the charging ports in Albany. ChargePoint runs 10 stations in Albany. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Stack Infra Por Evc-6?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 18, 2026, one of 187 stations in Oregon with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Stack Infra Por Evc-6 have?
Stack Infra Por Evc-6 has 2 charging ports: 2 Level 2.
Does Stack Infra Por Evc-6 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Stack Infra Por Evc-6 have?
Stack Infra Por Evc-6 has J1772 connectors.
Is Stack Infra Por Evc-6 open to the public?
Yes. Stack Infra Por Evc-6 is listed with public access, and its status is available.
Where is Stack Infra Por Evc-6?
Stack Infra Por Evc-6 is at 3130 NE Transition Parkway, Albany, OR 97321. Its coordinates are 44.67965, -123.06528.
More EV charging around Albany
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 469801, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Stack Infra Por Evc-6, Albany, OR (AFDC station 469801)”, https://chargecensus.com/stations/oregon/stack-infra-por-evc-6-469801 (data as of October 12, 2026).