Savanna Pool 1 Dual
AvailableEV charging station in Hillsboro, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 447032.
At a glance
Savanna Pool 1 Dual is a public EV charging station at 7220 SE Circuit Dr in Hillsboro, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 7, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 447032 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 7, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Transportation - 5th St North32 ports
OpConnect · Available
- Nike - LeBron19 ports
Non-networked · Available
- Fred Meyer - Tesla Supercharger16 ports
Tesla Supercharger · Available
- 12505 SW North Dakota12 ports
Autel · Available
- Nike - Hocken12 ports
Non-networked · Available
- Nike - Terman12 ports
Non-networked · Available
What kind of charging does Savanna Pool 1 Dual offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Savanna Pool 1 Dual compare with other stations in Hillsboro?
Hillsboro has 97 charging stations in the DOE registry with 203 ports, the 3rd-most of 194 cities and towns in Oregon. Savanna Pool 1 Dual accounts for under 1% of the charging ports in Hillsboro. ChargePoint runs 81 stations in Hillsboro. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Savanna Pool 1 Dual?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 7, 2025, one of 358 stations in Oregon with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Savanna Pool 1 Dual have?
Savanna Pool 1 Dual has 2 charging ports: 2 Level 2.
Does Savanna Pool 1 Dual have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Savanna Pool 1 Dual have?
Savanna Pool 1 Dual has J1772 connectors.
Is Savanna Pool 1 Dual open to the public?
Yes. Savanna Pool 1 Dual is listed with public access, and its status is available.
Where is Savanna Pool 1 Dual?
Savanna Pool 1 Dual is at 7220 SE Circuit Dr, Hillsboro, OR 97123. Its coordinates are 45.49590, -122.90610.
More EV charging around Hillsboro
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 447032, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Savanna Pool 1 Dual, Hillsboro, OR (AFDC station 447032)”, https://chargecensus.com/stations/oregon/savanna-pool-1-dual-447032 (data as of October 12, 2026).