EV charging station in Portland, Oregon on the Blink network — 1 Level 2. US DOE AFDC station 331440.

At a glance

Ride Connection Site 2 is a public EV charging station at 10670 Northwest Cornell Road in Portland, Oregon, on the Blink network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 8, 2022.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID331440
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateNov 8, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
10670 Northwest Cornell Road
State
Oregon
ZIP
97229
Coordinates
45.52562, -122.78686

Within ~15 km

Nearby charging

What kind of charging does Ride Connection Site 2 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Ride Connection Site 2 compare with other stations in Portland?

Portland has 303 charging stations in the DOE registry with 815 ports, the most of 194 cities and towns in Oregon. Ride Connection Site 2 accounts for under 1% of the charging ports in Portland. Blink runs 48 stations in Portland. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Ride Connection Site 2?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 215 of those stations are in Oregon, 12% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 8, 2022, one of 161 stations in Oregon with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ride Connection Site 2 have?

Ride Connection Site 2 has 1 charging port: 1 Level 2.

Does Ride Connection Site 2 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Ride Connection Site 2 have?

Ride Connection Site 2 has J1772 connectors.

Is Ride Connection Site 2 open to the public?

Yes. Ride Connection Site 2 is listed with public access, and its status is available.

Where is Ride Connection Site 2?

Ride Connection Site 2 is at 10670 Northwest Cornell Road, Portland, OR 97229. Its coordinates are 45.52562, -122.78686.

More EV charging around Portland

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 331440, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ride Connection Site 2, Portland, OR (AFDC station 331440)”, https://chargecensus.com/stations/oregon/ride-connection-site-2-331440 (data as of October 12, 2026).