ChargeCensus

Red Soils Fb-4

Available

EV charging station in Oregon City, Oregon on the ChargePoint network — 1 Level 2. US DOE AFDC station 296304.

At a glance

Red Soils Fb-4 is a public EV charging station at 150 Beavercreek Rd in Oregon City, Oregon, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 23, 2023.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID296304
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 23, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
150 Beavercreek Rd
State
Oregon
ZIP
97045
Coordinates
45.33425, -122.59937

Within ~15 km

Nearby charging

What kind of charging does Red Soils Fb-4 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Red Soils Fb-4 compare with other stations in Oregon City?

Oregon City has 43 charging stations in the DOE registry with 68 ports, the 7th-most of 194 cities and towns in Oregon. Red Soils Fb-4 accounts for 1% of the charging ports in Oregon City. ChargePoint runs 28 stations in Oregon City. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Red Soils Fb-4?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 23, 2023, one of 225 stations in Oregon with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Red Soils Fb-4 have?

Red Soils Fb-4 has 1 charging port: 1 Level 2.

Does Red Soils Fb-4 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Red Soils Fb-4 have?

Red Soils Fb-4 has J1772 connectors.

Is Red Soils Fb-4 open to the public?

Yes. Red Soils Fb-4 is listed with public access, and its status is available.

Where is Red Soils Fb-4?

Red Soils Fb-4 is at 150 Beavercreek Rd, Oregon City, OR 97045. Its coordinates are 45.33425, -122.59937.

More EV charging around Oregon City

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 296304, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Red Soils Fb-4, Oregon City, OR (AFDC station 296304)”, https://chargecensus.com/stations/oregon/red-soils-fb-4-296304 (data as of October 12, 2026).