Red Soils EV Charger #3
AvailableEV charging station in Oregon City, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 387914.
At a glance
Red Soils EV Charger #3 is a public EV charging station at 1000 Courthouse Road in Oregon City, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 18, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 387914 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 18, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1000 Courthouse Road
- City
- Oregon City
- State
- Oregon
- ZIP
- 97045
- Coordinates
- 45.33396, -122.60004
Within ~15 km
Nearby charging
- Windward Apartments14 ports
Blink · Available
Tesla Supercharger · Available
- Fuller Station Apartments12 ports
Blink · Available
Blink · Available
- Mercato Grove10 ports
Blink · Available
- Landmark Ford - 1200010 ports
Blink · Available
What kind of charging does Red Soils EV Charger #3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Red Soils EV Charger #3 compare with other stations in Oregon City?
Oregon City has 43 charging stations in the DOE registry with 68 ports, the 7th-most of 194 cities and towns in Oregon. Red Soils EV Charger #3 accounts for 3% of the charging ports in Oregon City. ChargePoint runs 28 stations in Oregon City. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Red Soils EV Charger #3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 18, 2025, one of 358 stations in Oregon with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Red Soils EV Charger #3 have?
Red Soils EV Charger #3 has 2 charging ports: 2 Level 2.
Does Red Soils EV Charger #3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Red Soils EV Charger #3 have?
Red Soils EV Charger #3 has J1772 connectors.
Is Red Soils EV Charger #3 open to the public?
Yes. Red Soils EV Charger #3 is listed with public access, and its status is available.
Where is Red Soils EV Charger #3?
Red Soils EV Charger #3 is at 1000 Courthouse Road, Oregon City, OR 97045. Its coordinates are 45.33396, -122.60004.
More EV charging around Oregon City
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 387914, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Red Soils EV Charger #3, Oregon City, OR (AFDC station 387914)”, https://chargecensus.com/stations/oregon/red-soils-ev-charger-3-387914 (data as of October 12, 2026).