Pge Sea L2
AvailableEV charging station in Salem, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 417253.
At a glance
Pge Sea L2 is a public EV charging station at 1040 State Street in Salem, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 30, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 417253 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 30, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- WattEV - Salem36 ports
Watt EV · Planned
- Keizer, OR - Tesla Supercharger16 ports
Tesla Supercharger · Available
- Mahonia Crossing14 ports
Loop · Available
Tesla Supercharger · Available
- Salem, OR - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Owen Summers Campus9 ports
Non-networked · Available
What kind of charging does Pge Sea L2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Pge Sea L2 compare with other stations in Salem?
Salem has 140 charging stations in the DOE registry with 344 ports, the 2nd-most of 194 cities and towns in Oregon. Pge Sea L2 accounts for under 1% of the charging ports in Salem. ChargePoint runs 63 stations in Salem. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Pge Sea L2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 30, 2025, one of 358 stations in Oregon with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pge Sea L2 have?
Pge Sea L2 has 2 charging ports: 2 Level 2.
Does Pge Sea L2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Pge Sea L2 have?
Pge Sea L2 has J1772 connectors.
Is Pge Sea L2 open to the public?
Yes. Pge Sea L2 is listed with public access, and its status is available.
Where is Pge Sea L2?
Pge Sea L2 is at 1040 State Street, Salem, OR 97301. Its coordinates are 44.93779, -123.02991.
More EV charging around Salem
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 417253, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pge Sea L2, Salem, OR (AFDC station 417253)”, https://chargecensus.com/stations/oregon/pge-sea-l2-417253 (data as of October 12, 2026).