Pge Bea L2
AvailableEV charging station in Beaverton, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 353901.
At a glance
Pge Bea L2 is a public EV charging station at 11850 Southwest Canyon Road in Beaverton, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 24, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 353901 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 24, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- Transportation - 5th St North32 ports
OpConnect · Available
- Adera Apartments28 ports
OpConnect · Available
- Terminal-1 Garage25 ports
Non-networked · Available
- Arvon Apartments23 ports
OpConnect · Available
- Nike - LeBron19 ports
Non-networked · Available
- Oregon Convention Center16 ports
Autel · Available
What kind of charging does Pge Bea L2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Pge Bea L2 compare with other stations in Beaverton?
Beaverton has 70 charging stations in the DOE registry with 302 ports, the 6th-most of 194 cities and towns in Oregon. Pge Bea L2 accounts for under 1% of the charging ports in Beaverton. ChargePoint runs 30 stations in Beaverton. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Pge Bea L2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 24, 2024, one of 302 stations in Oregon with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pge Bea L2 have?
Pge Bea L2 has 2 charging ports: 2 Level 2.
Does Pge Bea L2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Pge Bea L2 have?
Pge Bea L2 has J1772 connectors.
Is Pge Bea L2 open to the public?
Yes. Pge Bea L2 is listed with public access, and its status is available.
Where is Pge Bea L2?
Pge Bea L2 is at 11850 Southwest Canyon Road, Beaverton, OR 97005. Its coordinates are 45.48894, -122.79819.
More EV charging around Beaverton
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 353901, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pge Bea L2, Beaverton, OR (AFDC station 353901)”, https://chargecensus.com/stations/oregon/pge-bea-l2-353901 (data as of October 12, 2026).