Mosier Fsc Mosier Fsc 1
AvailableEV charging station in Mosier, Oregon on the ChargePoint network — 1 DC fast. US DOE AFDC station 395352.
At a glance
Mosier Fsc Mosier Fsc 1 is a public EV charging station at 801 1st Avenue in Mosier, Oregon, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since May 10, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 395352 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 10, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 801 1st Avenue
- City
- Mosier
- State
- Oregon
- ZIP
- 97040
- Coordinates
- 45.68442, -121.39575
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Lyle Market6 ports
Powerpump · Available
EVCS · Available
Electrify America · Available
FLO · Available
What kind of charging does Mosier Fsc Mosier Fsc 1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 62% below the Oregon average of 2.6 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Mosier Fsc Mosier Fsc 1 compare with other stations in Mosier?
Mosier has 3 charging stations in the DOE registry with 3 ports. Mosier Fsc Mosier Fsc 1 accounts for 33% of the charging ports in Mosier. ChargePoint runs 2 stations in Mosier. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Mosier Fsc Mosier Fsc 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 10, 2025, one of 358 stations in Oregon with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mosier Fsc Mosier Fsc 1 have?
Mosier Fsc Mosier Fsc 1 has 1 charging port: 1 DC fast.
Does Mosier Fsc Mosier Fsc 1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Mosier Fsc Mosier Fsc 1, with CHAdeMO and CCS connectors.
What connectors does Mosier Fsc Mosier Fsc 1 have?
Mosier Fsc Mosier Fsc 1 has CHAdeMO and CCS connectors.
Is Mosier Fsc Mosier Fsc 1 open to the public?
Yes. Mosier Fsc Mosier Fsc 1 is listed with public access, and its status is available.
Where is Mosier Fsc Mosier Fsc 1?
Mosier Fsc Mosier Fsc 1 is at 801 1st Avenue, Mosier, OR 97040. Its coordinates are 45.68442, -121.39575.
More EV charging around Mosier
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 395352, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mosier Fsc Mosier Fsc 1, Mosier, OR (AFDC station 395352)”, https://chargecensus.com/stations/oregon/mosier-fsc-mosier-fsc-1-395352 (data as of October 12, 2026).