Lithia Building at the Commons
AvailableEV charging station in Medford, Oregon, not on a charging network — 2 Level 2. US DOE AFDC station 103976.
At a glance
Lithia Building at the Commons is a public EV charging station at 148 N Riverside Ave in Medford, Oregon, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 1, 2018.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 103976 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Office building |
| Open date | Oct 1, 2018 |
| Last updated at source | Sep 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Within ~15 km
Nearby charging
IONNA · Available
- Medford, OR - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Starbucks Phoenix MB.HPC10 ports
Mercedes-Benz HPC · Available
- Medford, OR10 ports
Rivian Adventure Network · Available
Tesla Supercharger · Available
IONNA · Temporarily unavailable
What kind of charging does Lithia Building at the Commons offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a office building location.
How does Lithia Building at the Commons compare with other stations in Medford?
Medford has 33 charging stations in the DOE registry with 99 ports, the 11th-most of 194 cities and towns in Oregon. Lithia Building at the Commons accounts for 2% of the charging ports in Medford. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Lithia Building at the Commons?
Lithia Building at the Commons is listed as non-networked: its chargers are not run through a charging-network account. Oregon has 181 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 1, 2018, one of 53 stations in Oregon with a 2018 open date. The station's record was last updated at the source on Sep 14, 2026.
Frequently asked questions
How many chargers does Lithia Building at the Commons have?
Lithia Building at the Commons has 2 charging ports: 2 Level 2.
Does Lithia Building at the Commons have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Lithia Building at the Commons have?
Lithia Building at the Commons has J1772 connectors.
Is charging at Lithia Building at the Commons free?
Pricing as reported to the DOE registry: Free.
Is Lithia Building at the Commons open to the public?
Yes. Lithia Building at the Commons is listed with public access, and its status is available.
Where is Lithia Building at the Commons?
Lithia Building at the Commons is at 148 N Riverside Ave, Medford, OR 97501. Its coordinates are 42.32887, -122.87181.
More EV charging around Medford
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 103976, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Lithia Building at the Commons, Medford, OR (AFDC station 103976)”, https://chargecensus.com/stations/oregon/lithia-building-at-the-commons-103976 (data as of October 12, 2026).