Joco Fac Dimmick Campus
AvailableEV charging station in Grants Pass, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 346154.
At a glance
Joco Fac Dimmick Campus is a public EV charging station at 715 Northwest Dimmick Street in Grants Pass, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 14, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 346154 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 14, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 715 Northwest Dimmick Street
- City
- Grants Pass
- State
- Oregon
- ZIP
- 97526
- Coordinates
- 42.44707, -123.33280
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Electrify America · Available
- River_v_church River Church2 ports
ChargePoint · Available
- Mocks Ford Sales2 ports
Ford Charge · Available
- Tom Pearce County Park2 ports
FLO · Available
What kind of charging does Joco Fac Dimmick Campus offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Joco Fac Dimmick Campus compare with other stations in Grants Pass?
Grants Pass has 16 charging stations in the DOE registry with 53 ports, the 22nd-most of 194 cities and towns in Oregon. Joco Fac Dimmick Campus accounts for 4% of the charging ports in Grants Pass. ChargePoint runs 4 stations in Grants Pass. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Joco Fac Dimmick Campus?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 14, 2024, one of 302 stations in Oregon with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Joco Fac Dimmick Campus have?
Joco Fac Dimmick Campus has 2 charging ports: 2 Level 2.
Does Joco Fac Dimmick Campus have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Joco Fac Dimmick Campus have?
Joco Fac Dimmick Campus has J1772 connectors.
Is Joco Fac Dimmick Campus open to the public?
Yes. Joco Fac Dimmick Campus is listed with public access, and its status is available.
Where is Joco Fac Dimmick Campus?
Joco Fac Dimmick Campus is at 715 Northwest Dimmick Street, Grants Pass, OR 97526. Its coordinates are 42.44707, -123.33280.
More EV charging around Grants Pass
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 346154, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Joco Fac Dimmick Campus, Grants Pass, OR (AFDC station 346154)”, https://chargecensus.com/stations/oregon/joco-fac-dimmick-campus-346154 (data as of October 12, 2026).