ChargeCensus

Fgl&P Cedar/21st

Available

EV charging station in Forest Grove, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 205866.

At a glance

Fgl&P Cedar/21st is a public EV charging station at 2037 Cedar St in Forest Grove, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 4, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID205866
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 4, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2037 Cedar St
City
Forest Grove
State
Oregon
ZIP
97116
Coordinates
45.52088, -123.10630

Within ~15 km

Nearby charging

What kind of charging does Fgl&P Cedar/21st offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Fgl&P Cedar/21st compare with other stations in Forest Grove?

Forest Grove has 8 charging stations in the DOE registry with 18 ports. Fgl&P Cedar/21st accounts for 11% of the charging ports in Forest Grove. ChargePoint runs 6 stations in Forest Grove. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Fgl&P Cedar/21st?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 4, 2022, one of 161 stations in Oregon with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Fgl&P Cedar/21st have?

Fgl&P Cedar/21st has 2 charging ports: 2 Level 2.

Does Fgl&P Cedar/21st have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Fgl&P Cedar/21st have?

Fgl&P Cedar/21st has J1772 connectors.

Is Fgl&P Cedar/21st open to the public?

Yes. Fgl&P Cedar/21st is listed with public access, and its status is available.

Where is Fgl&P Cedar/21st?

Fgl&P Cedar/21st is at 2037 Cedar St, Forest Grove, OR 97116. Its coordinates are 45.52088, -123.10630.

More EV charging around Forest Grove

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 205866, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Fgl&P Cedar/21st, Forest Grove, OR (AFDC station 205866)”, https://chargecensus.com/stations/oregon/fgl-p-cedar-21st-205866 (data as of October 12, 2026).