ChargeCensus

Farnham Electric Construction

Available

EV charging station in McMinnville, Oregon, not on a charging network — 1 Level 2. US DOE AFDC station 197440.

At a glance

Farnham Electric Construction is a public EV charging station at 1050 NE Lafayette in McMinnville, Oregon, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 4, 2021.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID197440
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateOct 4, 2021
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
1050 NE Lafayette
State
Oregon
ZIP
97128
Coordinates
45.21388, -123.18610

Within ~15 km

Nearby charging

What kind of charging does Farnham Electric Construction offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a other location.

How does Farnham Electric Construction compare with other stations in McMinnville?

McMinnville has 14 charging stations in the DOE registry with 29 ports, the 25th-most of 194 cities and towns in Oregon. Farnham Electric Construction accounts for 3% of the charging ports in McMinnville. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Farnham Electric Construction?

Farnham Electric Construction is listed as non-networked: its chargers are not run through a charging-network account. Oregon has 181 non-networked stations, 10% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 4, 2021, one of 195 stations in Oregon with a 2021 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Farnham Electric Construction have?

Farnham Electric Construction has 1 charging port: 1 Level 2.

Does Farnham Electric Construction have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Farnham Electric Construction have?

Farnham Electric Construction has J1772 connectors.

Is charging at Farnham Electric Construction free?

Pricing as reported to the DOE registry: Free.

Is Farnham Electric Construction open to the public?

Yes. Farnham Electric Construction is listed with public access, and its status is available.

Where is Farnham Electric Construction?

Farnham Electric Construction is at 1050 NE Lafayette, McMinnville, OR 97128. Its coordinates are 45.21388, -123.18610.

More EV charging around McMinnville

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 197440, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Farnham Electric Construction, McMinnville, OR (AFDC station 197440)”, https://chargecensus.com/stations/oregon/farnham-electric-construction-197440 (data as of October 12, 2026).