ChargeCensus

Electric Era Charging Station

Available

EV charging station in Portland, Oregon on the Electric Era network — 2 DC fast. US DOE AFDC station 351678.

At a glance

Electric Era Charging Station is a public EV charging station at 16875 SW Pacific Hwy in Portland, Oregon, on the Electric Era network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jun 28, 2024.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID351678
NetworkElectric Era
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateJun 28, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Electric Era

Operates 31 stations in the DOE registry — view the full network →

Location

Address
16875 SW Pacific Hwy
State
Oregon
ZIP
97224
Coordinates
45.39855, -122.79957

Within ~15 km

Nearby charging

What kind of charging does Electric Era Charging Station offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.

How does Electric Era Charging Station compare with other stations in Portland?

Portland has 303 charging stations in the DOE registry with 815 ports, the most of 194 cities and towns in Oregon. Electric Era Charging Station accounts for under 1% of the charging ports in Portland. Electric Era runs 2 stations in Portland. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Electric Era Charging Station?

Electric Era operates 31 stations in the registry across 15 states, with 182 DC fast ports in total. 3 of those stations are in Oregon, under 1% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 28, 2024, one of 302 stations in Oregon with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Electric Era Charging Station have?

Electric Era Charging Station has 2 charging ports: 2 DC fast.

Does Electric Era Charging Station have DC fast charging?

Yes. The registry lists 2 DC fast ports at Electric Era Charging Station, with CCS connectors.

What connectors does Electric Era Charging Station have?

Electric Era Charging Station has CCS connectors.

Is Electric Era Charging Station open to the public?

Yes. Electric Era Charging Station is listed with public access, and its status is available.

Where is Electric Era Charging Station?

Electric Era Charging Station is at 16875 SW Pacific Hwy, Portland, OR 97224. Its coordinates are 45.39855, -122.79957.

More EV charging around Portland

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 351678, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Electric Era Charging Station, Portland, OR (AFDC station 351678)”, https://chargecensus.com/stations/oregon/electric-era-charging-station-351678 (data as of October 12, 2026).