ChargeCensus

Crpud Scappoosebaydc2

Available

EV charging station in Warren, Oregon on the ChargePoint network — 1 DC fast. US DOE AFDC station 350153.

At a glance

Crpud Scappoosebaydc2 is a public EV charging station at 57420 Old Portland Road in Warren, Oregon, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jul 9, 2024.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID350153
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 9, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
57420 Old Portland Road
City
Warren
State
Oregon
ZIP
97053
Coordinates
45.82934, -122.83874

Within ~15 km

Nearby charging

What kind of charging does Crpud Scappoosebaydc2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 62% below the Oregon average of 2.6 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Crpud Scappoosebaydc2 compare with other stations in Warren?

Warren has 3 charging stations in the DOE registry with 4 ports. Crpud Scappoosebaydc2 accounts for 25% of the charging ports in Warren. ChargePoint runs 3 stations in Warren. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Crpud Scappoosebaydc2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 9, 2024, one of 302 stations in Oregon with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Crpud Scappoosebaydc2 have?

Crpud Scappoosebaydc2 has 1 charging port: 1 DC fast.

Does Crpud Scappoosebaydc2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Crpud Scappoosebaydc2, with CHAdeMO and CCS connectors.

What connectors does Crpud Scappoosebaydc2 have?

Crpud Scappoosebaydc2 has CHAdeMO and CCS connectors.

Is Crpud Scappoosebaydc2 open to the public?

Yes. Crpud Scappoosebaydc2 is listed with public access, and its status is available.

Where is Crpud Scappoosebaydc2?

Crpud Scappoosebaydc2 is at 57420 Old Portland Road, Warren, OR 97053. Its coordinates are 45.82934, -122.83874.

More EV charging around Warren

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 350153, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Crpud Scappoosebaydc2, Warren, OR (AFDC station 350153)”, https://chargecensus.com/stations/oregon/crpud-scappoosebaydc2-350153 (data as of October 12, 2026).