Crpud Deer Island L2
AvailableEV charging station in Deer Island, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 174368.
At a glance
Crpud Deer Island L2 is a public EV charging station at 64001 Columbia River Hwy in Deer Island, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 174368 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 64001 Columbia River Hwy
- City
- Deer Island
- State
- Oregon
- ZIP
- 97054
- Coordinates
- 45.92473, -122.83677
Within ~15 km
Nearby charging
- 2250 Gable Rd8 ports
Loop · Available
- Starbucks Ridgefield MB.HPC6 ports
Mercedes-Benz HPC · Available
Electric Era · Available
- EZstop Kalama Waterfront4 ports
Non-networked · Available
- Iq Charging Ridgefield2 ports
ChargePoint · Available
- Crpud Scappoosebaylv22 ports
ChargePoint · Available
What kind of charging does Crpud Deer Island L2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Crpud Deer Island L2 compare with other stations in Deer Island?
Deer Island has 3 charging stations in the DOE registry with 4 ports. Crpud Deer Island L2 accounts for 50% of the charging ports in Deer Island. ChargePoint runs 3 stations in Deer Island. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Crpud Deer Island L2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 195 stations in Oregon with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Crpud Deer Island L2 have?
Crpud Deer Island L2 has 2 charging ports: 2 Level 2.
Does Crpud Deer Island L2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Crpud Deer Island L2 have?
Crpud Deer Island L2 has J1772 connectors.
Is Crpud Deer Island L2 open to the public?
Yes. Crpud Deer Island L2 is listed with public access, and its status is available.
Where is Crpud Deer Island L2?
Crpud Deer Island L2 is at 64001 Columbia River Hwy, Deer Island, OR 97054. Its coordinates are 45.92473, -122.83677.
More EV charging around Deer Island
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 174368, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Crpud Deer Island L2, Deer Island, OR (AFDC station 174368)”, https://chargecensus.com/stations/oregon/crpud-deer-island-l2-174368 (data as of October 12, 2026).