ChargeCensus

Cronin Lot Cronin 1.3

Available

EV charging station in Portland, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 352995.

At a glance

Cronin Lot Cronin 1.3 is a public EV charging station at 9000 Southwest Beaverton Hillsdale Highway in Portland, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 17, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID352995
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 17, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
9000 Southwest Beaverton Hillsdale Highway
State
Oregon
ZIP
97225
Coordinates
45.48621, -122.76784

Within ~15 km

Nearby charging

What kind of charging does Cronin Lot Cronin 1.3 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Cronin Lot Cronin 1.3 compare with other stations in Portland?

Portland has 303 charging stations in the DOE registry with 815 ports, the most of 194 cities and towns in Oregon. Cronin Lot Cronin 1.3 accounts for under 1% of the charging ports in Portland. ChargePoint runs 111 stations in Portland. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Cronin Lot Cronin 1.3?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 17, 2024, one of 302 stations in Oregon with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Cronin Lot Cronin 1.3 have?

Cronin Lot Cronin 1.3 has 2 charging ports: 2 Level 2.

Does Cronin Lot Cronin 1.3 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Cronin Lot Cronin 1.3 have?

Cronin Lot Cronin 1.3 has J1772 connectors.

Is Cronin Lot Cronin 1.3 open to the public?

Yes. Cronin Lot Cronin 1.3 is listed with public access, and its status is available.

Where is Cronin Lot Cronin 1.3?

Cronin Lot Cronin 1.3 is at 9000 Southwest Beaverton Hillsdale Highway, Portland, OR 97225. Its coordinates are 45.48621, -122.76784.

More EV charging around Portland

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 352995, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Cronin Lot Cronin 1.3, Portland, OR (AFDC station 352995)”, https://chargecensus.com/stations/oregon/cronin-lot-cronin-1-3-352995 (data as of October 12, 2026).