Cpud Cc Rider Dcfc
AvailableEV charging station in Rainier, Oregon on the ChargePoint network — 1 DC fast. US DOE AFDC station 356444.
At a glance
Cpud Cc Rider Dcfc is a public EV charging station at 207 W B St in Rainier, Oregon, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Sep 26, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 356444 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 26, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 207 W B St
- City
- Rainier
- State
- Oregon
- ZIP
- 97048
- Coordinates
- 46.08975, -122.93766
Within ~15 km
Nearby charging
- Kelso, WA - Tesla Supercharger12 ports
Tesla Supercharger · Available
- EZstop Kalama Waterfront4 ports
Non-networked · Available
- Bud Clary Ford4 ports
Ford Charge · Available
Electrify America · Available
- Lcc Lcc H&S #12 ports
ChargePoint · Available
- Cowlitz PUD Main Office2 ports
Blink · Available
What kind of charging does Cpud Cc Rider Dcfc offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 62% below the Oregon average of 2.6 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Cpud Cc Rider Dcfc compare with other stations in Rainier?
Rainier has 2 charging stations in the DOE registry with 3 ports. Cpud Cc Rider Dcfc accounts for 33% of the charging ports in Rainier. ChargePoint runs 2 stations in Rainier. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Cpud Cc Rider Dcfc?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 26, 2024, one of 302 stations in Oregon with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cpud Cc Rider Dcfc have?
Cpud Cc Rider Dcfc has 1 charging port: 1 DC fast.
Does Cpud Cc Rider Dcfc have DC fast charging?
Yes. The registry lists 1 DC fast port at Cpud Cc Rider Dcfc, with CHAdeMO and CCS connectors.
What connectors does Cpud Cc Rider Dcfc have?
Cpud Cc Rider Dcfc has CHAdeMO and CCS connectors.
Is Cpud Cc Rider Dcfc open to the public?
Yes. Cpud Cc Rider Dcfc is listed with public access, and its status is available.
Where is Cpud Cc Rider Dcfc?
Cpud Cc Rider Dcfc is at 207 W B St, Rainier, OR 97048. Its coordinates are 46.08975, -122.93766.
More EV charging around Rainier
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 356444, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cpud Cc Rider Dcfc, Rainier, OR (AFDC station 356444)”, https://chargecensus.com/stations/oregon/cpud-cc-rider-dcfc-356444 (data as of October 12, 2026).