ChargeCensus

City Of Toledo City Hall

Available

EV charging station in Toledo, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 191401.

At a glance

City Of Toledo City Hall is a public EV charging station at 200 N Main St in Toledo, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 23, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID191401
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 23, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
200 N Main St
City
Toledo
State
Oregon
ZIP
97391
Coordinates
44.62130, -123.93708

Within ~15 km

Nearby charging

What kind of charging does City Of Toledo City Hall offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does City Of Toledo City Hall compare with other stations in Toledo?

Toledo has 3 charging stations in the DOE registry with 6 ports. City Of Toledo City Hall accounts for 33% of the charging ports in Toledo. ChargePoint runs 3 stations in Toledo. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates City Of Toledo City Hall?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 23, 2021, one of 195 stations in Oregon with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does City Of Toledo City Hall have?

City Of Toledo City Hall has 2 charging ports: 2 Level 2.

Does City Of Toledo City Hall have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does City Of Toledo City Hall have?

City Of Toledo City Hall has J1772 connectors.

Is City Of Toledo City Hall open to the public?

Yes. City Of Toledo City Hall is listed with public access, and its status is available.

Where is City Of Toledo City Hall?

City Of Toledo City Hall is at 200 N Main St, Toledo, OR 97391. Its coordinates are 44.62130, -123.93708.

More EV charging around Toledo

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 191401, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City Of Toledo City Hall, Toledo, OR (AFDC station 191401)”, https://chargecensus.com/stations/oregon/city-of-toledo-city-hall-191401 (data as of October 12, 2026).