Chemeketa Green Lot
AvailableEV charging station in Salem, Oregon on the Blink network — 2 Level 2. US DOE AFDC station 259934.
At a glance
Chemeketa Green Lot is a public EV charging station at 44.977584, -122.978775 in Salem, Oregon, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 11, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 259934 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 11, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- WattEV - Salem36 ports
Watt EV · Planned
- Keizer, OR - Tesla Supercharger16 ports
Tesla Supercharger · Available
- Mahonia Crossing14 ports
Loop · Available
Tesla Supercharger · Available
- Salem, OR - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Owen Summers Campus9 ports
Non-networked · Available
What kind of charging does Chemeketa Green Lot offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Chemeketa Green Lot compare with other stations in Salem?
Salem has 140 charging stations in the DOE registry with 344 ports, the 2nd-most of 194 cities and towns in Oregon. Chemeketa Green Lot accounts for under 1% of the charging ports in Salem. Blink runs 17 stations in Salem. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Chemeketa Green Lot?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 215 of those stations are in Oregon, 12% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 11, 2022, one of 161 stations in Oregon with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Chemeketa Green Lot have?
Chemeketa Green Lot has 2 charging ports: 2 Level 2.
Does Chemeketa Green Lot have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Chemeketa Green Lot have?
Chemeketa Green Lot has J1772 connectors.
Is Chemeketa Green Lot open to the public?
Yes. Chemeketa Green Lot is listed with public access, and its status is available.
Where is Chemeketa Green Lot?
Chemeketa Green Lot is at 44.977584, -122.978775, Salem, OR 97305. Its coordinates are 44.97760, -122.97873.
More EV charging around Salem
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 259934, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Chemeketa Green Lot, Salem, OR (AFDC station 259934)”, https://chargecensus.com/stations/oregon/chemeketa-green-lot-259934 (data as of October 12, 2026).