Boulder Falls Center
AvailableEV charging station in Lebanon, Oregon, not on a charging network — 2 Level 2. US DOE AFDC station 145623.
At a glance
Boulder Falls Center is a public EV charging station at 605 Mullins Dr in Lebanon, Oregon, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 1, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 145623 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Inn |
| Open date | Sep 1, 2019 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 605 Mullins Dr
- City
- Lebanon
- State
- Oregon
- ZIP
- 97355
- Coordinates
- 44.55165, -122.90938
Within ~15 km
Nearby charging
- Walmart 5396 (Albany, OR)4 ports
Electrify America · Available
- Lbcc Lbcc Dual 42 ports
ChargePoint · Available
Non-networked · Available
ChargePoint · Available
Turnongreen · Available
- Lassen Chevrolet Toyota1 ports
Non-networked · Available
What kind of charging does Boulder Falls Center offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a inn location.
How does Boulder Falls Center compare with other stations in Lebanon?
Lebanon has 5 charging stations in the DOE registry with 10 ports. Boulder Falls Center accounts for 20% of the charging ports in Lebanon. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Boulder Falls Center?
Boulder Falls Center is listed as non-networked: its chargers are not run through a charging-network account. Oregon has 181 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 1, 2019, one of 54 stations in Oregon with a 2019 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Boulder Falls Center have?
Boulder Falls Center has 2 charging ports: 2 Level 2.
Does Boulder Falls Center have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Boulder Falls Center have?
Boulder Falls Center has J1772 connectors.
Is charging at Boulder Falls Center free?
Pricing as reported to the DOE registry: Free.
Is Boulder Falls Center open to the public?
Yes. Boulder Falls Center is listed with public access, and its status is available.
Where is Boulder Falls Center?
Boulder Falls Center is at 605 Mullins Dr, Lebanon, OR 97355. Its coordinates are 44.55165, -122.90938.
More EV charging around Lebanon
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 145623, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Boulder Falls Center, Lebanon, OR (AFDC station 145623)”, https://chargecensus.com/stations/oregon/boulder-falls-center-145623 (data as of October 12, 2026).