Seth Wadley Chevrolet
AvailableEV charging station in Ada, Oklahoma, not on a charging network — 1 Level 2. US DOE AFDC station 146767.
At a glance
Seth Wadley Chevrolet is a public EV charging station at 1301 N Broadway Ave in Ada, Oklahoma, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 18, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 146767 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Car dealership |
| Open date | Sep 18, 2019 |
| Last updated at source | Sep 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1301 N Broadway Ave
- City
- Ada
- State
- Oklahoma
- ZIP
- 74820
- Coordinates
- 34.78744, -96.67934
Within ~15 km
Nearby charging
ChargePoint · Available
- North Hills Shopping8 ports
Francis Energy · Available
Francis Energy · Available
- ECU School of Business3 ports
Non-networked · Available
- Seth Wadley Ford of Ada1 ports
Non-networked · Available
What kind of charging does Seth Wadley Chevrolet offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 77% below the Oklahoma average of 4.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a car dealership location.
How does Seth Wadley Chevrolet compare with other stations in Ada?
Ada has 6 charging stations in the DOE registry with 27 ports, the 11th-most of 102 cities and towns in Oklahoma. Seth Wadley Chevrolet accounts for 4% of the charging ports in Ada. Statewide, Oklahoma has 457 stations and 1,967 ports, the 36th-largest station count of the 51 states and DC. The biggest station in Oklahoma, Fort Sill in Fort Sill, has 106 ports.
Who operates Seth Wadley Chevrolet?
Seth Wadley Chevrolet is listed as non-networked: its chargers are not run through a charging-network account. Oklahoma has 94 non-networked stations, 21% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 18, 2019, one of 29 stations in Oklahoma with a 2019 open date. The station's record was last updated at the source on Sep 14, 2026.
Frequently asked questions
How many chargers does Seth Wadley Chevrolet have?
Seth Wadley Chevrolet has 1 charging port: 1 Level 2.
Does Seth Wadley Chevrolet have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Seth Wadley Chevrolet have?
Seth Wadley Chevrolet has J1772 connectors.
Is Seth Wadley Chevrolet open to the public?
Yes. Seth Wadley Chevrolet is listed with public access, and its status is available.
Where is Seth Wadley Chevrolet?
Seth Wadley Chevrolet is at 1301 N Broadway Ave, Ada, OK 74820. Its coordinates are 34.78744, -96.67934.
More EV charging around Ada
Working with Oklahoma charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 146767, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Seth Wadley Chevrolet, Ada, OK (AFDC station 146767)”, https://chargecensus.com/stations/oklahoma/seth-wadley-chevrolet-146767 (data as of October 12, 2026).