Temporarily unavailableEV charging station in Comanche, Oklahoma on the EV Connect network — 2 DC fast. US DOE AFDC station 198020.
At a glance
City of Comanche is a public EV charging station at 200 N Rodeo Dr. in Comanche, Oklahoma, on the EV Connect network. It has 2 charging ports (2 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as temporarily unavailable, open since Oct 19, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 198020 |
| Network | EV Connect |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Oct 19, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 200 N Rodeo Dr.
- City
- Comanche
- State
- Oklahoma
- ZIP
- 73529
- Coordinates
- 34.37012, -97.96402
Within ~15 km
Nearby charging
- DRH Health6 ports
Blink · Available
- Asap General 313 Ev11 ports
ChargePoint · Available
- Asap General 313ev21 ports
ChargePoint · Available
What kind of charging does City of Comanche offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about half of the Oklahoma average of 4.3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does City of Comanche compare with other stations in Comanche?
Comanche has 1 charging station in the DOE registry with 2 ports. It is the only EV Connect station in Comanche. Statewide, Oklahoma has 457 stations and 1,967 ports, the 36th-largest station count of the 51 states and DC. The biggest station in Oklahoma, Fort Sill in Fort Sill, has 106 ports.
Who operates City of Comanche?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 13 of those stations are in Oklahoma, 3% of the state's 457.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 19, 2021, one of 37 stations in Oklahoma with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does City of Comanche have?
City of Comanche has 2 charging ports: 2 DC fast.
Does City of Comanche have DC fast charging?
Yes. The registry lists 2 DC fast ports at City of Comanche, with CHAdeMO and CCS connectors.
What connectors does City of Comanche have?
City of Comanche has CHAdeMO and CCS connectors.
Is City of Comanche open to the public?
Yes. City of Comanche is listed with public access, and its status is temporarily unavailable.
Where is City of Comanche?
City of Comanche is at 200 N Rodeo Dr., Comanche, OK 73529. Its coordinates are 34.37012, -97.96402.
More EV charging around Comanche
Working with Oklahoma charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 198020, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “City of Comanche, Comanche, OK (AFDC station 198020)”, https://chargecensus.com/stations/oklahoma/city-of-comanche-198020 (data as of October 12, 2026).