ChargeCensus

Voss Station Voss 1

Available

EV charging station in Centerville, Ohio on the ChargePoint network — 1 DC fast. US DOE AFDC station 252150.

At a glance

Voss Station Voss 1 is a public EV charging station at 766 Miamisburg Centerville Rd in Centerville, Ohio, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jan 26, 2023.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID252150
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 26, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
766 Miamisburg Centerville Rd
State
Ohio
ZIP
45459
Coordinates
39.62678, -84.17740

Within ~15 km

Nearby charging

What kind of charging does Voss Station Voss 1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Voss Station Voss 1 compare with other stations in Centerville?

Centerville has 12 charging stations in the DOE registry with 26 ports. Voss Station Voss 1 accounts for 4% of the charging ports in Centerville. ChargePoint runs 5 stations in Centerville. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Voss Station Voss 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 26, 2023, one of 305 stations in Ohio with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Voss Station Voss 1 have?

Voss Station Voss 1 has 1 charging port: 1 DC fast.

Does Voss Station Voss 1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Voss Station Voss 1, with CHAdeMO and CCS connectors.

What connectors does Voss Station Voss 1 have?

Voss Station Voss 1 has CHAdeMO and CCS connectors.

Is Voss Station Voss 1 open to the public?

Yes. Voss Station Voss 1 is listed with public access, and its status is available.

Where is Voss Station Voss 1?

Voss Station Voss 1 is at 766 Miamisburg Centerville Rd, Centerville, OH 45459. Its coordinates are 39.62678, -84.17740.

More EV charging around Centerville

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 252150, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Voss Station Voss 1, Centerville, OH (AFDC station 252150)”, https://chargecensus.com/stations/ohio/voss-station-voss-1-252150 (data as of October 12, 2026).