Tri-C Metro Campus Lot 6
AvailableEV charging station in Cleveland, Ohio on the FLO network — 2 Level 2. US DOE AFDC station 360928.
At a glance
Tri-C Metro Campus Lot 6 is a public EV charging station at 2900 Community College Ave in Cleveland, Ohio, on the FLO network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 29, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 360928 |
| Network | FLO |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 29, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Parma, OH - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
Blink · Available
What kind of charging does Tri-C Metro Campus Lot 6 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Tri-C Metro Campus Lot 6 compare with other stations in Cleveland?
Cleveland has 74 charging stations in the DOE registry with 205 ports, the 4th-most of 326 cities and towns in Ohio. Tri-C Metro Campus Lot 6 accounts for under 1% of the charging ports in Cleveland. FLO runs 4 stations in Cleveland. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Tri-C Metro Campus Lot 6?
FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 99 of those stations are in Ohio, 5% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 29, 2024, one of 350 stations in Ohio with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Tri-C Metro Campus Lot 6 have?
Tri-C Metro Campus Lot 6 has 2 charging ports: 2 Level 2.
Does Tri-C Metro Campus Lot 6 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Tri-C Metro Campus Lot 6 have?
Tri-C Metro Campus Lot 6 has J1772 connectors.
Is Tri-C Metro Campus Lot 6 open to the public?
Yes. Tri-C Metro Campus Lot 6 is listed with public access, and its status is available.
Where is Tri-C Metro Campus Lot 6?
Tri-C Metro Campus Lot 6 is at 2900 Community College Ave, Cleveland, OH 44115. Its coordinates are 41.49261, -81.67001.
More EV charging around Cleveland
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 360928, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Tri-C Metro Campus Lot 6, Cleveland, OH (AFDC station 360928)”, https://chargecensus.com/stations/ohio/tri-c-metro-campus-lot-6-360928 (data as of October 12, 2026).