Tomko Power Link 2
AvailableEV charging station in Avon Lake, Ohio on the ChargePoint network — 1 DC fast. US DOE AFDC station 354701.
At a glance
Tomko Power Link 2 is a public EV charging station at 33725 Walker Rd in Avon Lake, Ohio, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Aug 31, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 354701 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 31, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 33725 Walker Rd
- City
- Avon Lake
- State
- Ohio
- ZIP
- 44012
- Coordinates
- 41.49232, -82.06070
Within ~15 km
Nearby charging
- Menards Avon 3357 (Avon, OH)12 ports
Electrify America · Available
- Mark Wahlberg Chevrolet of Avon10 ports
Red E · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- South Ridge Inn6 ports
Universal EV Chargers · Available
- Amherst Family Health Center6 ports
Blink · Available
What kind of charging does Tomko Power Link 2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Tomko Power Link 2 compare with other stations in Avon Lake?
Avon Lake has 3 charging stations in the DOE registry with 8 ports. Tomko Power Link 2 accounts for 13% of the charging ports in Avon Lake. ChargePoint runs 2 stations in Avon Lake. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Tomko Power Link 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 31, 2024, one of 350 stations in Ohio with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Tomko Power Link 2 have?
Tomko Power Link 2 has 1 charging port: 1 DC fast.
Does Tomko Power Link 2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Tomko Power Link 2, with CHAdeMO and CCS connectors.
What connectors does Tomko Power Link 2 have?
Tomko Power Link 2 has CHAdeMO and CCS connectors.
Is Tomko Power Link 2 open to the public?
Yes. Tomko Power Link 2 is listed with public access, and its status is available.
Where is Tomko Power Link 2?
Tomko Power Link 2 is at 33725 Walker Rd, Avon Lake, OH 44012. Its coordinates are 41.49232, -82.06070.
More EV charging around Avon Lake
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 354701, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Tomko Power Link 2, Avon Lake, OH (AFDC station 354701)”, https://chargecensus.com/stations/ohio/tomko-power-link-2-354701 (data as of October 12, 2026).