The Villas at Gervasi Vineyard
AvailableEV charging station in Canton, Ohio, not on a charging network — 1 Level 2. US DOE AFDC station 137151.
At a glance
The Villas at Gervasi Vineyard is a public EV charging station at 1700 55th St NE in Canton, Ohio, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 19, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 137151 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Brewery / distillery / winery |
| Open date | May 19, 2019 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Within ~15 km
Nearby charging
- Canton Oh Sdc88 ports
Non-networked · Available
Tesla Supercharger · Available
- Belden Park Crossings6 ports
EVgo · Available
- Hampton Inn - Canton4 ports
Francis Energy · Available
- Pilot Travel Center 4694 ports
EVgo · Available
- Liberty Ford Canton4 ports
Non-networked · Available
What kind of charging does The Villas at Gervasi Vineyard offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a brewery / distillery / winery location.
How does The Villas at Gervasi Vineyard compare with other stations in Canton?
Canton has 17 charging stations in the DOE registry with 124 ports, the 17th-most of 326 cities and towns in Ohio. The Villas at Gervasi Vineyard accounts for under 1% of the charging ports in Canton. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates The Villas at Gervasi Vineyard?
The Villas at Gervasi Vineyard is listed as non-networked: its chargers are not run through a charging-network account. Ohio has 307 non-networked stations, 14% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 19, 2019, one of 93 stations in Ohio with a 2019 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does The Villas at Gervasi Vineyard have?
The Villas at Gervasi Vineyard has 1 charging port: 1 Level 2.
Does The Villas at Gervasi Vineyard have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does The Villas at Gervasi Vineyard have?
The Villas at Gervasi Vineyard has J1772 connectors.
Is charging at The Villas at Gervasi Vineyard free?
Pricing as reported to the DOE registry: Free.
Is The Villas at Gervasi Vineyard open to the public?
Yes. The Villas at Gervasi Vineyard is listed with public access, and its status is available.
Where is The Villas at Gervasi Vineyard?
The Villas at Gervasi Vineyard is at 1700 55th St NE, Canton, OH 44721. Its coordinates are 40.85674, -81.34899.
More EV charging around Canton
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 137151, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Villas at Gervasi Vineyard, Canton, OH (AFDC station 137151)”, https://chargecensus.com/stations/ohio/the-villas-at-gervasi-vineyard-137151 (data as of October 12, 2026).