ChargeCensus

Smartland Breakwater

Available

EV charging station in Cleveland, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 147526.

At a glance

Smartland Breakwater is a public EV charging station at 14100 Lakeshore Blvd in Cleveland, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 6, 2019.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID147526
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 6, 2019
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
14100 Lakeshore Blvd
State
Ohio
ZIP
44110
Coordinates
41.57002, -81.58374

Within ~15 km

Nearby charging

What kind of charging does Smartland Breakwater offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Smartland Breakwater compare with other stations in Cleveland?

Cleveland has 74 charging stations in the DOE registry with 205 ports, the 4th-most of 326 cities and towns in Ohio. Smartland Breakwater accounts for under 1% of the charging ports in Cleveland. ChargePoint runs 40 stations in Cleveland. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Smartland Breakwater?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 6, 2019, one of 93 stations in Ohio with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Smartland Breakwater have?

Smartland Breakwater has 2 charging ports: 2 Level 2.

Does Smartland Breakwater have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Smartland Breakwater have?

Smartland Breakwater has J1772 connectors.

Is Smartland Breakwater open to the public?

Yes. Smartland Breakwater is listed with public access, and its status is available.

Where is Smartland Breakwater?

Smartland Breakwater is at 14100 Lakeshore Blvd, Cleveland, OH 44110. Its coordinates are 41.57002, -81.58374.

More EV charging around Cleveland

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 147526, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Smartland Breakwater, Cleveland, OH (AFDC station 147526)”, https://chargecensus.com/stations/ohio/smartland-breakwater-147526 (data as of October 12, 2026).