ChargeCensus

Sawyer Point Building

Available

EV charging station in Cincinnati, Ohio on the AmpUp network — 2 Level 2. US DOE AFDC station 319426.

At a glance

Sawyer Point Building is a public EV charging station at 720 E Pete Rose Way in Cincinnati, Ohio, on the AmpUp network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 17, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID319426
NetworkAmpUp
StatusAvailable (E)
AccessPublic
Open dateMay 17, 2023
Last updated at sourceOct 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.35 per kWh

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
720 E Pete Rose Way
State
Ohio
ZIP
45202
Coordinates
39.10000, -84.50000

Within ~15 km

Nearby charging

What kind of charging does Sawyer Point Building offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.35 per kWh”.

How does Sawyer Point Building compare with other stations in Cincinnati?

Cincinnati has 152 charging stations in the DOE registry with 542 ports, the 2nd-most of 326 cities and towns in Ohio. Sawyer Point Building accounts for under 1% of the charging ports in Cincinnati. AmpUp runs 6 stations in Cincinnati. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.

Who operates Sawyer Point Building?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 53 of those stations are in Ohio, 2% of the state's 2,153.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 17, 2023, one of 305 stations in Ohio with a 2023 open date. The station's record was last updated at the source on Oct 2, 2026.

Frequently asked questions

How many chargers does Sawyer Point Building have?

Sawyer Point Building has 2 charging ports: 2 Level 2.

Does Sawyer Point Building have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Sawyer Point Building have?

Sawyer Point Building has J1772 connectors.

Is charging at Sawyer Point Building free?

Pricing as reported to the DOE registry: $0.35 per kWh.

Is Sawyer Point Building open to the public?

Yes. Sawyer Point Building is listed with public access, and its status is available.

Where is Sawyer Point Building?

Sawyer Point Building is at 720 E Pete Rose Way, Cincinnati, OH 45202. Its coordinates are 39.10000, -84.50000.

More EV charging around Cincinnati

Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 319426, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Sawyer Point Building, Cincinnati, OH (AFDC station 319426)”, https://chargecensus.com/stations/ohio/sawyer-point-building-319426 (data as of October 12, 2026).