Obe The Tower
AvailableEV charging station in Painesville, Ohio on the ChargePoint network — 2 Level 2. US DOE AFDC station 354357.
At a glance
Obe The Tower is a public EV charging station at 30 South Park Place in Painesville, Ohio, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 29, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 354357 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 29, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 30 South Park Place
- City
- Painesville
- State
- Ohio
- ZIP
- 44077
- Coordinates
- 41.72344, -81.24418
Within ~15 km
Nearby charging
IONNA · Available
Tesla Supercharger · Available
- Mentor Hospital6 ports
Blink · Available
- Classic Ford4 ports
Ford Charge · Available
Electrify America · Available
- E Building Oabb-D52 ports
ChargePoint · Available
What kind of charging does Obe The Tower offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Ohio average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Obe The Tower compare with other stations in Painesville?
Painesville has 2 charging stations in the DOE registry with 3 ports. Obe The Tower accounts for 67% of the charging ports in Painesville. It is the only ChargePoint station in Painesville. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Obe The Tower?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 29, 2024, one of 350 stations in Ohio with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Obe The Tower have?
Obe The Tower has 2 charging ports: 2 Level 2.
Does Obe The Tower have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Obe The Tower have?
Obe The Tower has J1772 connectors.
Is Obe The Tower open to the public?
Yes. Obe The Tower is listed with public access, and its status is available.
Where is Obe The Tower?
Obe The Tower is at 30 South Park Place, Painesville, OH 44077. Its coordinates are 41.72344, -81.24418.
More EV charging around Painesville
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 354357, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Obe The Tower, Painesville, OH (AFDC station 354357)”, https://chargecensus.com/stations/ohio/obe-the-tower-354357 (data as of October 12, 2026).