Ncec-Attica Nce Dc 62
AvailableEV charging station in Attica, Ohio on the ChargePoint network — 1 DC fast. US DOE AFDC station 347818.
At a glance
Ncec-Attica Nce Dc 62 is a public EV charging station at 350 Stump Pike Rd in Attica, Ohio, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jun 14, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 347818 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 14, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 350 Stump Pike Rd
- City
- Attica
- State
- Ohio
- ZIP
- 44807
- Coordinates
- 41.06581, -82.90094
Within ~15 km
Nearby charging
- Ncec-Attica Nw- Vetlibrary2 ports
ChargePoint · Available
- Ncec-Attica Nce-22 ports
ChargePoint · Available
- Ncec-Attica Northcentral Ec2 ports
ChargePoint · Available
- Ncec-Attica Station 12 ports
ChargePoint · Available
What kind of charging does Ncec-Attica Nce Dc 62 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Ohio average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Ncec-Attica Nce Dc 62 compare with other stations in Attica?
Attica has 4 charging stations in the DOE registry with 7 ports. Ncec-Attica Nce Dc 62 accounts for 14% of the charging ports in Attica. ChargePoint runs 4 stations in Attica. Statewide, Ohio has 2,153 stations and 6,112 ports, the 12th-largest station count of the 51 states and DC. The biggest station in Ohio, Canton Oh Sdc in Canton, has 88 ports.
Who operates Ncec-Attica Nce Dc 62?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,048 of those stations are in Ohio, 49% of the state's 2,153.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 14, 2024, one of 350 stations in Ohio with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ncec-Attica Nce Dc 62 have?
Ncec-Attica Nce Dc 62 has 1 charging port: 1 DC fast.
Does Ncec-Attica Nce Dc 62 have DC fast charging?
Yes. The registry lists 1 DC fast port at Ncec-Attica Nce Dc 62, with CHAdeMO and CCS connectors.
What connectors does Ncec-Attica Nce Dc 62 have?
Ncec-Attica Nce Dc 62 has CHAdeMO and CCS connectors.
Is Ncec-Attica Nce Dc 62 open to the public?
Yes. Ncec-Attica Nce Dc 62 is listed with public access, and its status is available.
Where is Ncec-Attica Nce Dc 62?
Ncec-Attica Nce Dc 62 is at 350 Stump Pike Rd, Attica, OH 44807. Its coordinates are 41.06581, -82.90094.
More EV charging around Attica
Working with Ohio charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 347818, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ncec-Attica Nce Dc 62, Attica, OH (AFDC station 347818)”, https://chargecensus.com/stations/ohio/ncec-attica-nce-dc-62-347818 (data as of October 12, 2026).